Profit and budget analysis of coal slime drying: (Zhengzhou Taida Coal slime dryer, drying slime production line in Henan, Zhengzhou Taida Coal drying technology)
Coal slime Drying investment program analysis:
Take the coal slime containing water 25% for example, dryed to 10-15% of finished coal, it is dryed to 0.88 tons per ton; at present, slime purchase price is 200 yuan / ton, after drying the price could be 450 or so per ton. According to install a coal slime drying production line of daily production is 300, cost and profit analysis is as follows:
Costs of coal slime drying production line:
Staff, 3-4 people per class, salary of two classes: 350 yuan / day
Power: Total Power 52.5KW × 0.7 = 36.75KW, 36.75 degrees per hour, switched 20 hours a day, total: 735 degrees × 0.9 yuan / degree = 661.50 yuan.
Fuel: every ton of coal slime drying using standard coal of about 18Kg, Calculate
as 500 yuan per tonne of standard coal, cost of coal is 5.4 tons per day, total: 2700 yuan.
Fees Subtotal: 3711.5 yuan.
Profit of slime drying production line:
Purchase slime 300 tons per day, 264 tons of coal drying finished, according to the price of 400 yuan per ton, total: 105,600 yuan.
Coal slime is 200 yuan per ton, the purchase is 300 tons per day, total: 6000 yuan.
Consolidated profit :105600-60000-3711.50 = 41888.5 yuan / day
Note: The prices of coal slime of different parts is different, coal product prices are different accordingly, and the wages, price are varies, please calculate on the basis of local market price.
If you interested in slime and sludge drying technology and operational experience, please contest us, we will explain it face to face.